The following scenario has been seen during assessment:
An inspection body is contracted to carry out accredited inspection under type C independence. The inspector arrives on site and starts the inspection activity. Partway through the inspection activity the client requests that some remedial activities are carried out. The inspector states that this can be done but the inspection will now be unaccredited as it is no longer meeting the requirements of ISO/IEC 17020. The client signs a declaration on site that they are happy with this and so the inspector continues with the inspection once the remedial work is completed but it is not covered under accreditation. The remedial work is performed by the Inspector before he continues with the inspection.
We do not feel this is acceptable practice although it is clear that the client has agreed to this at the time of the inspection activity being undertaken. EA-3/01 states:
When a CAB’s customer requires an activity, which is covered by the CAB’s scope of accreditation, it is an implicit expectation of the customer to get an accredited report/certificate. So, for conformity assessment activities that are covered by the CAB`s scope of accreditation, the CAB shall issue an accredited report/certificate unless explicitly agreed in a legal or documented arrangement between the CAB and its customer. In these cases, the CAB shall inform its customer that such reports/certificates are not accredited reports/certificates and are consequently not covered by EA MLA.
However, this last possibility cannot be applied when the reports/certificates containing results covered by the accreditation scope are in an area where accreditation is mandatory by law or under contractual conditions (e.g.: under a conformity assessment scheme) or when they are to be displayed or sent to third parties (public or authorities). In such cases, the use of the accreditation symbol or a claim of accreditation status is mandatory, unless prevented by legal or regulatory requirements. We feel that the statement “unless explicitly agreed in a legal or documented arrangement between the CAB and its customer” does not apply to changing the accreditation status part way through the inspection activity and should be an agreement prior to the inspection being carried out, e.g. it is clear that the client may request remedial works and it is clear that if this is the case then the inspection activity cannot be performed under accreditation.
- Should it be allowed for a CAB to change the accreditation status of an inspection activity part way through if this is not agreed prior to the inspection taking place but is agreed with the client at the time of the inspection.
- If there is a clause in the contract agreed with the client that if remedial work is carried out by the inspector during the inspection activity, then the inspection itself will be changed from accredited to non-accredited.
September 2026
Question 1:
It was agreed that it would not be possible for the inspector to change the accreditation status of the inspection part way through the inspection due to the following:ISO 17020 states:
7.2.3 – Any apparent abnormalities notified to, or noticed by, the inspector shall be recorded. Where there is any doubt as to the item’s suitability for the inspection to be carried out, or where the item does not conform to the description provided, the inspection body shall contact the client before proceeding.Therefore the client needs to ensure that the item being inspected is in line with the details provided at the contract stage and act accordingly to ISO/IEC 17020:2012, 7.2.3.The inspection needs to adhere to the agreed contract , it is not possible to change the focus of the inspection part way through because there are aspects of the item that require maintenance etc.
Question 2:
ISO/IEC 17020:2012 Annex A.3b) states: an inspector cannot perform design / manufacture / supply / installations / servicing / maintenance and inspection of the same item – except where a regulatory requirement explicitly allows it and as long as the exception does not compromise the inspection results.With the above clause in mind it was agreed that if there are remedial works to be carried out and this is clear in the contract then the inspection can be carried out as an unaccredited activity due to the inspection criteria not meeting the requirements of ISO/IEC 17020 but as detailed above the accreditation status of the inspection cannot be changed part way through.

